Sign In | Join Free | My chinacomputerparts.com
China Shanghai Puyi Industrial Co., Ltd. logo
Shanghai Puyi Industrial Co., Ltd.
Quality first, service first, continuous improvement and innovation to meet the customers.
Verified Supplier

7 Years

Home > Continuous Rubber Track >

300×52.5K×76 Rubber Track Undercarriage / Lightweight Rubber Tracks For Construction Equipment

Shanghai Puyi Industrial Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment

300×52.5K×76 Rubber Track Undercarriage / Lightweight Rubber Tracks For Construction Equipment

Brand Name : PY

Model Number : 300*52.5K*76

Certification : ISO9001

Place of Origin : SHANGHAI CHINA

MOQ : 2 PCS

Price : Negotiable

Payment Terms : T/T

Supply Ability : 3000 pcs per month

Delivery Time : 7 days

Packaging Details : Paller with stretch film

Width : 300mm

Pitch : 52.5mm

Link : 76

Material : Rubber and Steel

Overall length : 3990mm

Weight : 120.16kg

Contact Now

Yanmar B2u Rubber Tracks 300*52.5K*76 for Construction Equipment:

Applicable machines Hitachi excavator
Material rubber and steel
Specification 300*52.5*76
Installation position Installed on the excavators


The characteristics of rubber tracks:


1. Rubber tracks cause less damage to roads than steel tracks, and less rutting on soft ground than steel tracks
2. A benefit to equipment operating in congested areas, rubber tracks make less noise than steel tracks
3. Rubber tracks permit machines to travel at a higher speed than steel tracks
4. Rubber tracks insulated machine and operator from vibraion, exteding the service life of machine and decreasing operator's fatigue
5. The ground pressure of rubbr tracks equipped machinery can be fairly low, about 0.14-2.30 kg/m2, a major reason for its use on wet and soft terrain.
6. The added traction of rubber tracked vehicles permits them to pull twice the load of wheeled vehicles of the same weight.
7. Rubber tracks' pulling performance being twice that of wheels, it permits the lighter vehicles equip with rubber track to do the same pulling work than that of wheeled vehicles.


The notices of using rubber tracks:

1. Adjust the tension of the rubber crawler so that the height, the variable range is 10-20mm when the machine is lifted. Readjust when the tension decreases. (Be careful because the rubber crawler may come off if the tension is too low).
2. Avoid projection from the frame around the rubber crawler, especially on its inner circumference. (Rubber crawlers are easily deformed; If it comes into contact with the frame, an accident such the rubber being cut can occur).
3. Avoid sharp projections when traveling.
4. Avoid turning too fast on concrete roads with a high coefficient of frction because this can cause accidents such as cutting the rubber.
5. Be careful that no oil, etc adheres to the rubber track. If it does, wipe it off immediately.
6. When storing for long periods, keep indoors, away from direct sunshine and rain.
7. Replace as soon as possible when abrasion of sprockets is observed
300×52.5K×76 Rubber Track Undercarriage / Lightweight Rubber Tracks For Construction Equipment
We also have other kinds of and sizes of rubber tracks, if you have interest in it, do not hesitate to send me a message and I will be very glad to be at your service.
Looking forward to receiving your enquiry.


Parameters:

size width*pitch link A B C D F pattern guiding
130*72 29-40 23 64.5 28 28 15 AF1 A2
150*60 32-40 22 64 22.5 24.5 15 AC A2
150*72 29-40 23 64 23 23 15 AC A2
170*60 30-40 19 57 22 22 13 CE A1
180*60 30-40 23.5 64 21 21.5 15 AM A1
180*72 31-43 25 68 29 29 15 BK A2
180*72K 32-48 20 61 22 19.5 17 BB1 B2
B180*72 31-43 23 66 30 29 15 BB1 B2
H180*72 30-50 23 64 27 26 17 BK A2
190*60 30-40 23.5 64 21 21.5 14 AM A1
190*72 31-41 21 68 27.5 26.5 15 BF A2
200*72 34-47 23 76 28.5 26.5 18 BB1 A2
200*72K 37-47 21 69 29.5 29 18 BM A2
Y200*72 40-52 24 64 28.5 29.5 12 BK A2
230*48 60-84 24 72 24 25 21 BI B1
230*48K 60-84 24 66 21 20 19 BI B2
230*72 42-56 24 82 30 26 18 AF1 A2
230*72K 42-56 20 69 29.5 28 16 BD A2
230*96 30-48 25 68 23.5 25.5 22 BE B1
230*101 30-36 25 74 22.5 29 19 BO B1
250*47K 84 23 70 24 20 22 BD B2
250*48.5K 80-88 24 66 21 20 19 CA B2
250*52.5K 72-78 26 81 23 25 25 BA B2
250*52.5 72-78 29 72 23 25 21 BI B1
250*72 47-57 24 82 30 26 18 AF1 A2
B250*72 34-60 23 64 29 22 10 CI A2
B250*72B 34-60 23 78 29 26 16 AB B2
250*96 35-38 25 70 20 19 22 BB1 B2
250*109 35-38 40 89 24.5 14 20 CG B1
260*55.5K 74-80 31 80 21.5 27 24 CA B2
Y260*96 38-41 25 68 23 25.5 22 AB B1
260*109 35-39 30 84 24 29 15 AB B1
E280*52.5K 70-88 29 84 27 26 22 BI B2
280*72 45-64 25 78 29.5 26 22 AL A2
Y280*106K 35-42 30 80 27.5 28 20 AB B2
300*52.5N 72-98 30 82 25 18 20 BI B1
300*52.5W 72-92 43 96 22 23 22 BE B1
300*52.5K 70-84 29 84 27 26 22 BI B2
300*52.5KW 72-92 40 92 25 24 22 BI C1
E300*52.5K 70-88 29 84 27 26 22 BI B2
KB300*52.5 72-92 40 90 24.5 24.5 22 BI C1
KB300*52.5N 72-98 30 82 23 20 25 BI B1
JD300*52.5N 72-98 30 80 23.5 22 22 BI B1
300*53K 80-96 31 88 25 19.5 21 BI B2
300*55 70-88 29 86 25.5 27.5 23 BI B1
300*55.5K 76-82 31 82 22 27 21.5 CA B2
300*71K 72-76 42 106 23 24 40 BD B2
300*72 36-40 23 75 40 34 18 BK A2
BA300*72 36-46 26 76 29 27 19 AF1 A2
300*109N 35-42 29 82 27 28 25 BE B1
300*109W 35-44 38 90 26 29 24 BB1 B1
K300*109 37-41 27 85 23.5 27.5 20 AB B2
300*109WK 35-42 40 90 24.5 14 23 CG B1
320*52.5 72-98 30 83 23.5 18 21 BI B1
320*54 70-84 29 80 23 21 20 AB B1
B320*55K 70-88 30 82 25 30 23 BE B2
Y320*106K 39-43 31 80 26 27 24 AB B2
350*52.5 70-92 40 94 22.5 19 30.5 BE B1
E350*52.5K 70-88 29 84 27 26 22 BI B2
350*54.5K 80-86 40 92 23.5 22.5 23 AD B2
B350*55K 70-88 30 82 25 30 23 BE B2
350*56 80-86 39 89 25.5 16.5 20.5 BC B1
350*75.5K 74 37 98 24.5 25 25 CA C2
350*108 40-46 40 90 24.5 14 25 CG B1
350*109 41-44 40 92 26 20 25 BO B1
Y370*107K 39-41 38 94 25.5 28 23.5 AB B2
400*72.5N 70-80 38 100 26 24 25 AF3 B1
400*72.5W 68-92 51 108 26 24 25 BI B1
Y400*72.5K 72-74 28 86 30 24.5 25 AF3 C2
KB400*72.5K 68-76 37 94 24 26 23.5 BA B2
400*72.5KW 68-92 46 112 24 23.5 25 BI B2
400*74 68-76 38 100 25.5 29.5 24 BH2 B1
400*75.5K 74 39 100 25 26 25 CA C2
Y400*107K 46 38 89 27 25 25 AB C2
K400*142 36-37 27 87 34 27 29 CF C2
400*144 36-41 47 98 27 11 30 CF B1
Y400*144K 36-41 35 126 29.5 26 25 BE B2
450*71 76-88 42.5 115 29.5 17 30 BE B1
DW450*71 76-88 44 114 31 27 25 BD B1
450*73.5 76-84 42 118 31 34 28 CG B1
450*76 80-84 48 122 30.5 31.5 26 BI B1
450*81N 72-80 42 117 26 24 27 BE B1
450*81W 72-78 58 140 29 32 30 BI B1
KB450*81.5 72-80 42 110 31.5 27.5 26 BD B1
K450*83.5 72-74 42 112 24.5 25 28 BI B1
Y450*83.5K 72-74 38 113 24 27 26 CA B2
K450*163 38 38 114 27 28 30 AB B2
485*92W 74 62 142 34 33 30 BE B2
K500*71 72-76 41 106 23 24 42 BE B2
500*92 72-84 48 130 27 26 29 BI B1
500*92W 78-84 64 155 32.5 35.5 33 BI B1
K500*146 35 40 106 26.5 24.5 50 BB1 A2

300×52.5K×76 Rubber Track Undercarriage / Lightweight Rubber Tracks For Construction Equipment


Product Tags:

replacement digger tracks

      

rubber tracks for diggers

      
China 300×52.5K×76 Rubber Track Undercarriage / Lightweight Rubber Tracks For Construction Equipment factory

300×52.5K×76 Rubber Track Undercarriage / Lightweight Rubber Tracks For Construction Equipment Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Shanghai Puyi Industrial Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)